RERM - bs - roof
RERM - bs - inside finish, 7
RERM - bs - inside finish, 8
RERM - bs - inside finish, 5
RERM - bs - inside finish, 6
RERM - bs - end in place
RERM - bs - outside finish, 3
RERM - bs - outside finish, 2
RERM - bs - outside finish, 4
RERM - bs - first fix seats
RERM - bs - grab rails
RERM - bs - floor and some side sections
RERM - bs - groove clean
RERM - bs - the final result
RERM - bs - legs to fit
RERM - bs - power supply
RERM - bs - delivery time
RERM - bs - legless
RERM - discussions
RERM - introductions
RERM - offical opening speech
RERM - ribbon cut
RERM - unveiling
RERM - platform view
RERM - bs - repairs in progress
RERM - bs - distorted
RERM - bs - original panel cleaned
RERM - bs - six roof sticks before
RERM - bs - oversize repair
RERM - bs - roof stick ends
RERM - bs - under repair
RERM - bs - repaired old end arch
RERM - bs - window beads
RERM - starting again
RERM - bs - right a bit
RERM - bs - who left that there
RERM - bs - fitting the floor
RERM - painting gutter
RERM - Katie comes home
RERM - almost ready
RERM - opening day TSnPA
RERM - finished
RERM - mary fair
bamm - clubhouse
RERM - bs - outer finish, 1
RERM - bs - gloss topcoat
RERM - bs - air vent
RERM - bs - structural dry build 2
RERM - bs - structural dry build 3
RERM - bs - structural dry build 1
RERM - bs - roof dry fit
RERM - bs - planking progress
RERM - bs - old door repairs
RERM - bs - old door panels
RERM - bs - new to old
RERM - bs - new floor
RERM - bs - new door planked
RERM - bs - holes repaired
RERM - bs - joint in undercoat
RERM - bs - new door frame
RERM - bs - glossed roof
RERM - bs - glossed interior
RERM - bs - exterior view of planking
RERM - bs - exterior gloss
RERM - bs - interior planks
RERM - bs - colour matching
RERM - bs - chamfer details
RERM - bs - adding in the old
RERM - bs - van loaded
SR RERM
RERM - bs - for sale
RERM - sign
RERM - bs - damaged vertical / door post
RERM - bs - damaged corner 1
RERM bs - damaged corner 4
RERM - bs - damaged corner 5
RERM - bs - side and door 1
RERM - bs - for sale removal
RERM - bs - damaged corner 3
RERM - bs - damaged corner 2
RERM - bs - corner patch
RERM - bs - air vent interior
RERM - progress supervisor
RERM - new sign
RERM - display working
stm - gwr fire engine
stm - The Bristolian
stm - cycling lion
olb - B702
O&S - Mo tools 2
O&S - Mo tools 1
FRG - NSR No's 2, 127 & 61
O&S - lamps
BM BV - signwritter was 'ere
BM - eve - Mary M hill climbing
vvm - visitors and residents
vvm - A&P 3315
vvm - part display
vvm - advance
vvm - featherstone
vvm - horsebox
vvm - afs to restore
vvm - outside guys
vvm - display area
vvm - four bikes
vvm - pioneer
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
198 visits
RERM - bs - cills and floor
All nice and squared away, the rest of the floor planks are on their way to be laid. Not far from the store pile to their place, a few feet only.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.