gbww[13] - 206 snow - going 2
oaw[HH] - hedgepigs, winter quarters Jan'13
gbww[13] - 206 snow - gone
gbww[13] - 206 snow depth
css / gbw [13] - cloud rip
gbww[13] - 206 snow - going 1
gbww[13] - Jan 2013 snowy trees
css / gbw - morning sky
NSR 127 - cleaning panel
NSR 127 - another module for repair
NSR 127 - dry fit of first side
NSR 127 - cill installation
NSR 127 - repair underway
NSR 127 - side by side
NSR 127 - top hinge
NSR 127 - top rail repairs
NSR 127 - droplight sets
NSR 127 - under upper waist rail
NSR 127 - repaired verticals
NSR 127 - upper tenon
NSR 127 - module primed
WR (O&A) Q&C - up in the air
WR (O&A) Q&C - training row in Port
BJ - upright repairs.
BJ - lower tenon
LW - scraper work
VPC - lens
VPC - plate end
BM FC - end view
oad - irish wolfie
NSR 127 - repair blanks
NSR 127 - fillet inserted
NSR 127 - thin fillets
NSR 127 - repaired areas
NSR 127 - rusty fixings
NSR 127 - holes filled
aav / gbw - high spate
BM FC - interior body planking
CSB - view amidships
BM FC - interior end planks
CSB - full length above
CSB - view for'd
aav / gbw - water rail
aav / gbw - it was raining upstream
SWP - old chair
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
310 visits
AR - machining side bars
Ashleigh machining the curved section of the droplight side bars.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.