A&P - underside
A&P - closeup inside
FU - camera!
BM CV - waiting time
BM CV - external full
BN CV - external closer
BM CV - bike
BM CV - speeches 1
BM CV - speeches 2
BM CV - speeches 3
BM FC - writing 1
HHD - go on, give it here
HHD - on the doorstep
HHD - coffee gone
A&P - custodian and awning
BC/No.25 - Plas y Nant
No.25 at Beddgelert
BC/No.25 - makers outshop
NER70 - TiG - spinner
A&P - fit side boards
HHD - ears defended
MF - tank refurbisment
A&P - ready for varnish
BM FC - panel joints
BM FC - bulkhead planks
BM FC - bulkhead base
SCL - Alan in 55secs
SCL - 55 seconds
BM FC - interior cleared
A&P - joints
NER70 - floor planks
MF - engine space
BM FC - inside
BM FC - doorway
BM FC - arrival
BM FC - old headstock
BM FC - doorlatch
BM FC - Newalls patent
BM FC - shildon plate
BM FC - interior
BM FC - S&D 179 at locomotion
BM FC - 1975 condition
BM FC - being refurbished in 1975
BM FC - identity
A&P - build in progress
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
301 visits
BM FC - panel out
Section of side successfully removed. This sectional construction will allow a greater proportion of bench work during the restoration.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.