StoneRoad2013's photos with the keyword: cab

bmm[23] - Taxi {1 of 2}

30 Jun 2023 1 59
The automated taxi / cab from the dystopian 1995 Judge Dredd film [classed as sci-fi]. en.wikipedia.org/wiki/Judge_Dredd_(film)

SSW - from side

22 Jun 2013 1 1424
Completed cab, from the side, taken in low light conditions.

SSW - Built

22 Jun 2013 220
The cab as built and before the sign-writer visited.

SSW - gloss interior

28 Oct 2012 587
The standard Sentinel light grey interior gloss. Just a few final touches, such as installing the sliding hatches.

SSW - exterior gloss

28 Oct 2012 436
Starting to build up the top / gloss coats on the exterior of the cab.

SSW - finished underside

28 Oct 2012 440
The grey gloss top coat on the underside of the roof.

SSW - seats and bunker primed

22 Sep 2012 1 495
Assembled and primed, some more areas will get extra attention before the undercoat is applied.

SSW - internal view

22 Sep 2012 1 483
This is a very sturdy construction. Coal Bunker is in the middle, between the wider Driver's seat and narrower Stoker's Seat. Locker spaces under both seats. Starting to apply the undercoat.

SSW - in first undercoat

22 Sep 2012 1 484
Cab seats and bunker assembled and in the first application of the grey undercoat. Stoker's seat raised for access to that side's locker. The roof is leaning against the carriage in the background.

SSW - Metalwork test

22 Sep 2012 1 435
The metalwork has been bent into shape......just a quick check that it fits, more or less close enough for now.

SSW - metalwork made

03 Oct 2012 2 1 528
This metal work is about ready to be attached to the cab body sides.

SSW - roof trial

03 Oct 2012 1 475
Trial fit for the roof onto the cab body. Some areas of the undercoat to the interior are still drying.

SSW - contemplating the future

03 Oct 2012 1 609
Trying the driver's seat for size, and thinking.........

SSW - cab dry fit

14 Aug 2012 407
Further progress on dry fitting the timber parts of the cab, including the ash bend. Next will be the roof and the seats/bunker assembly.

SSW - Roof dry build

25 Aug 2012 425
Planking is now screwed down as a dry build. The various curves make this not really the simplest job in the world. As with all things - very easy when you know how !

SSW - Cab roof frame

25 Aug 2012 395
Roof sticks now fitted to the ash bend.

SSW - rear panel

11 Jul 2012 363
The rear panel of the cab, with the access hatch opening. Some primer has been applied. (btw, the osb on the floor is a pattern for the footplate)

SSW - cab side panel

11 Jul 2012 417
One of the cab side panels is lined up for dry fitting. The first coat of primer has revealed a couple of minor surface irregularities, these are under attention. After which more primer will be applied.

19 items in total