StoneRoad2013's photos with the keyword: cab
bmm[23] - Taxi {1 of 2}
30 Jun 2023 |
|
|
The automated taxi / cab from the dystopian 1995 Judge Dredd film [classed as sci-fi].
en.wikipedia.org/wiki/Judge_Dredd_(film)
SSW - from side
SSW - Built
SSW - gloss interior
28 Oct 2012 |
|
The standard Sentinel light grey interior gloss. Just a few final touches, such as installing the sliding hatches.
SSW - exterior gloss
28 Oct 2012 |
|
Starting to build up the top / gloss coats on the exterior of the cab.
SSW - finished underside
SSW - seats and bunker primed
22 Sep 2012 |
|
|
Assembled and primed, some more areas will get extra attention before the undercoat is applied.
SSW - internal view
22 Sep 2012 |
|
|
This is a very sturdy construction. Coal Bunker is in the middle, between the wider Driver's seat and narrower Stoker's Seat. Locker spaces under both seats. Starting to apply the undercoat.
SSW - in first undercoat
22 Sep 2012 |
|
|
Cab seats and bunker assembled and in the first application of the grey undercoat. Stoker's seat raised for access to that side's locker. The roof is leaning against the carriage in the background.
SSW - Metalwork test
22 Sep 2012 |
|
|
The metalwork has been bent into shape......just a quick check that it fits, more or less close enough for now.
SSW - metalwork made
03 Oct 2012 |
|
|
|
This metal work is about ready to be attached to the cab body sides.
SSW - roof trial
03 Oct 2012 |
|
|
Trial fit for the roof onto the cab body. Some areas of the undercoat to the interior are still drying.
SSW - contemplating the future
SSW - cab dry fit
14 Aug 2012 |
|
Further progress on dry fitting the timber parts of the cab, including the ash bend. Next will be the roof and the seats/bunker assembly.
SSW - Roof dry build
25 Aug 2012 |
|
Planking is now screwed down as a dry build. The various curves make this not really the simplest job in the world. As with all things - very easy when you know how !
SSW - Cab roof frame
SSW - rear panel
11 Jul 2012 |
|
The rear panel of the cab, with the access hatch opening. Some primer has been applied. (btw, the osb on the floor is a pattern for the footplate)
SSW - cab side panel
11 Jul 2012 |
|
One of the cab side panels is lined up for dry fitting. The first coat of primer has revealed a couple of minor surface irregularities, these are under attention. After which more primer will be applied.
Jump to top
RSS feed- StoneRoad2013's latest photos with "cab" - Photos
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter