StoneRoad2013's photos with the keyword: Webster's Haulage

CF - exterior

26 Mar 2011 591
Whilst collecting the completed waggon B-49 to return it to the Bowes Railway (Springwell), Webster's Brimec gets the slideback right into the workshop.

MF - about to unload

27 Mar 2011 517
The crane operator, and the driver of the low loader consult as to the positioning moves. Not as easy as you might think - there were some overhead phone lines to avoid.

MFL - gate shot

04 Jan 2016 394
The traditional "leaving the workshop site" image - it was raining very heavily with strong gusts by this point.

MFL - driver

04 Jan 2016 1 1 442
"Matty" with a broad grin despite the weather.

MFL - loaded up

04 Jan 2016 439
Boat fully secured and almost ready to depart. The crane and lifting kit has been packed away, the slinger and operator are having a well earned PNB - personal needs break - mainly food and cuppas.

MFL - complicated

04 Jan 2016 379
Combination of packing and strops to secure the boat onto the low-loader. The crane strops will stay for now. The other job will be to slide the main mast onto the trailer.

MFL - backing in

04 Jan 2016 346
Having shifted the cradle, the low loader is backing in, underneath the raised boat.

MFL - at the ready

04 Jan 2016 1 1 427
taken in lowlight conditions and a bit too quick for the camera ... The Low-loader (Webster's Haulage) and the crane (Reeds Bray) parked up ready for the 0800 start, the briefing and cuppas first.

CF - two jobs arriving

09 Mar 2013 1 456
Visit from Webster's - their smaller Brimec (slideback) is delivering two jobs at once.

NSR127 - delivery by Websters

13 Jun 2012 403
Webster's low-loader delivering NSR127 to the workshop in Haltwhistle (June 2012).

BR DB - arriving at Haltwhistle

04 Apr 2011 364
The Bowes Railway have asked us to rebuild a couple of waggons damaged by a recent arson attack. This is B1, the Kibblesworth Drift Bogie about to be winched off Webster's Brimec.

BR GW - leaving 3

04 Apr 2011 401
Webster's Brimec leaving Haltwhistle with B-49, going home to the Bowes Railway, Springwell.

BR DB - touchdown 1

04 Apr 2011 358
The first pair of wheels back on the rails at Springwell.

BR DB - touch down 2

04 Apr 2011 441
And the second pair of wheels are down.

BR DB - loading up

04 Apr 2011 346
The rebuilt Kibblesworth Drift Bogie is winched up onto Webster's Brimec for the trip home to Springwell.

BR DB - arrived back

04 Apr 2011 361
Webster's Brimec has just arrived back at the Bowes Railway with the Drift Bogie on board.

BM BV - Bread Van arrive 1

28 Mar 2011 413
The Bread and Chip Vans arrive for restoration from Beamish Museum, on the back of Webster's Brimec.

BM BV - Bread Van arrive 2

28 Mar 2011 417
The Bread Van is lowered into the workshop.

28 items in total