WipeJoint122015 0887
WipeJoint122015 0888
WipeJoint122015 0889
WipeJoint122015 0890
WipeJoint122015 0891
WipeJoint122015 0892
WipeJoint122015 0893
WipeJoint122015 0894
WipeJoint122015 0895
WipeJoint122015 0896
WipeJoint122015 0897
WipeJoint122015 0898
WipeJoint122015 0899
WipeJoint122015 0900
WipeJoint122015 0901
WipeJoint122015 0903
WipeJoint122015 0904
WipeJoint122015 0905
WipeJoint122015 0906
WipeJoint122015 0907
WipeJoint122015 0908
WipeJoint122015 0909
WipeJoint122015 0911
WipeJoint122015 0914
WipeJoint122015 0915
WipeJoint122015 0916
WipeJoint122015 0917
WipeJoint122015 0918
WipeJoint122015 0919
WipeJoint122015 0920
WipeJoint122015 0921
WipeJoint122015 0922
WipeJoint122015 0923
WipeJoint122015 0885
WipeJoint122015 0884
WipeJoint122015 0883
WipeJoint122015 0882
Goodwood Revival Sept 2015 Pit Crew 7 XPro1
Goodwood Revival Sept 2015 Pit Crew 5 XPro1
Goodwood Revival Sept 2015 Pit Crew 4 XPro1
Goodwood Revival Sept 2015 Pit Crew 3 XPro1
Goodwood Revival Sept 2015 Pit Crew 2 XPro1
Goodwood Revival Sept 2015 In The Pit Lane 1 XPro1
Goodwood Revival Sept 2015 Pit Crew 1 XPro1
Judging the Pit
Rare photo ...
TelstraPTnWireless 816
TelecomPitsnPillar 815
TelecomManholeCover 814
CommsPits 30
Sandaoling Xinjiang China 20th November 2014
Sandaoling China 18th November 2014
Sandaoling China November 2014
Sandaoling Xinjiang China 16th November 2014
Sandaoling Xijiang China
Sandaoling Xijiang China
Sandaoling China Coal Train
Sandaoling China Shift Change
Sandaoling Xinjiang China
Sandaoling Xinjiang China
CablePit201401 006
CablePit cable 99
CablePit cable 96
Blavatnik pit
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
160 visits
WipeJoint122015 0886
The jointer uses an LPG torch to melt solder (60 lead/ 40 tin) which is wiped around the cable, using a piece of hide to build a thickness of solder which seals the cable and gives some strength to the joint. Sterene, a fat based product, is melted onto the assist the wiping process.
Paper insulated lead-covered cable was damaged by NBN builders placing too much gear in the cable pit. Cable jointers from Telstra are repairing the water-damaged circuits. They were working at this and another nearby junction pit and pillar.
Paper insulated lead-covered cable was damaged by NBN builders placing too much gear in the cable pit. Cable jointers from Telstra are repairing the water-damaged circuits. They were working at this and another nearby junction pit and pillar.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.