open reach engineers - Newhaven - 6 6 2024
Water colour of a coastal communication station
Red Walls of phone box and post box in Wimpole!
HFF by Phone 20240718 15 15 00 Pro
troulos 001
La poste The post office
HTO Tower (3A)
HTO Tower (2)
Telephone engineers - Seaford - 23 8 2023
A repurposed telephone box beside eastbourne pier…
Four in a row
Nerantziotisa WiFi antenna
QSL SVA (1999)
SriLanka-1983-2.50
Elsie Pritchard telephonist WW1
Artbox - St Pancras Station - London - 11.4.2013
Drusillas phonebox - 14.4.2014
East Dean phone box 15 7 2023
National HRO-60
Lafayette HE-30
20/Modem and aerial
199404Athol0002
Kagaru 090108 028
Parramatta Rope 20220413 08 55 59 Pro
Distribution Box 20220303 15 42 44 Pro
T Time 20220303 10 11 24 Pro
Location
Lat, Lng:
Lat, Lng:
You can copy the above to your favourite mapping app.
Address: unknown
Lat, Lng:
You can copy the above to your favourite mapping app.
Address: unknown
See also...
words...mots...palavras...wörter...parole...palabras...слова...
words...mots...palavras...wörter...parole...palabras...слова...
Signs signs signs / Enseignes, pancartes, panneaux et autres.
Signs signs signs / Enseignes, pancartes, panneaux et autres.
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
157 visits
199308Ulantunnel3Up0003
Site visit by potential contractors. Tunnel three (Bylong) Up end. The 375-107 is the distance from Sydney in Kms. The tunnel is single track and is 1.975Km long. August 1993.
HWW my viewers for 12/06/24.
The earth works, 5 tunnels and numerous bridges were constructed in the 1930s but track wasn't laid until the 1980s in the Sandy Hollow to Gulgong section and is never likely to be laid in the Gulgong to Mary Vale section. The tunnel closest to Sandy Hollow was used as a road between its construction and the track being laid.
HWW my viewers for 12/06/24.
The earth works, 5 tunnels and numerous bridges were constructed in the 1930s but track wasn't laid until the 1980s in the Sandy Hollow to Gulgong section and is never likely to be laid in the Gulgong to Mary Vale section. The tunnel closest to Sandy Hollow was used as a road between its construction and the track being laid.
Robert Swanson, Gillian Everett, Gudrun, tiabunna and 3 other people have particularly liked this photo
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
GrahamH club has replied to LotharW clubGrahamH club has replied to Roger (Grisly) clubHWW Graham
GrahamH club has replied to Xata clubGrahamH club has replied to tiabunna clubGrahamH club has replied to Gudrun clubOne of the project's huts was at the far end of this tunnel. I observed that it could take 15 minutes before I could see the light from this end of the tunnel after a train had been through. This situation meant we had to do a lot of organising when we had to put a project team person on a train on this line rather than I or another just getting on a loco of a passing train or one of the project's test trains when we needed to follow up on a driver's observation or investigate a problem the project team had found..
Gudrun club has replied to GrahamH clubGrahamH club has replied to Gillian Everett clubSign-in to write a comment.