WR - old logo
WR - passing the fish-quay
WR - return inline ahead
1001 - NLR carriage
gbw - Durdle Door
gbw - full set
gbw - half a sunset
gbw - Kimmeridge Bay [HBM]
gbw - Lulworth Cove
gbw - the Crumple
gbw - Man O'War Bay.
gbw - Stair Hole
gbw - why the cove ?
O&S - Castle on the hill
O&S - chain
O&S - Clavell Tower
O&S - daycare
O&S - slighted
O&S - Swanage pier
O&S - trebuchet
O&S - wellington tower {1 of 2}
O&S - wellington tower {2 of 2}
olb - Swanage mersey 12-23
WR - Barnstaple quay
WR (O&A) - River Tyne - under the bridge
WR (O&A) Q&C - Criccieth
WR (O&A) Q&C - return journey
TiG - swanage crane 2
TiG - Secundus [2 of 2]
TiG - Secundus [1 of 2]
TiG - plates on Manston
TiG - Manston
TiG - crane 1
SSW - tynedale 2016
OLB - car and boat
OLB - 2008 Whitby harbour day
O&S - lamps
O&S - Goebel ticket printing machine
O&S - goebel minders
O&S - Corfe Castle
MFL - 29th Jan 2016
gbw - tulips
wst[16] / bri - Pooley
1001 - carriage 911
PQR - steady pull
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
325 visits
WR - for repair
"William Riley" on the bank on the R. Taw, in Barnstaple in 2005.
We needed to move her up-stream, "navigate" around sundry even deader boats, posts etc. on the way to the "quay" - then wait for the crane ...
She 'floated' only on the highest "spring" high tides, which come into the estuary at quite a speed.
We needed to move her up-stream, "navigate" around sundry even deader boats, posts etc. on the way to the "quay" - then wait for the crane ...
She 'floated' only on the highest "spring" high tides, which come into the estuary at quite a speed.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.