BM FC - rebuilding underway
CSB - block pre-paint
CSB - progress of the engine rebuild
OOD - door surface
OOD - damaged doors
OOD - doors in situ
CSB - refitting parts
OOD - machining stiles
OOD - stile removed
NSR 127 - cills installed
NSR 127 - first corner module
NSR 127 - grain filler
NSR 127 - floor plank evidence
NSR 127 - new door parts
NSR 127 - middle hinge
NSR 127 - primer on panel
NSR 127 - door part details
NSR 127 - repairs to uprights
NSR 127 - side module replaced
nbx - new bird boxes
O&S - old ghost sign
LB - joins in the work
TiG - Wickham (Deeside)
BM FC - varnishing
BM FC - doors progressing
BM FC - finishing in progress.
gbw - March 10th Lake District fells
SSW - attaching metalwork
BM FC - brake and box
CF - more garden
BBH - display case
SWP - turned spotlight stand fittings
BJ - cleaning up joint
1001 - AFS hose carrier
TiG - Corris carriage
BJ - varnishing coach
BJ - finishing brackets
BJ - attaching metalwork to cabside
AR - new lower rail
AR - door part details
LW - to be repaired
LW - timber repairs
LW - using Myford lathe
LW - repairing spotlight stand
LW - Stand fittings
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
455 visits
BM FC - touching up brackets
Finishing touches to the sqaure head coach scews holding the brackets.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.