SCL - lift begins
SCL - new interior
No.25 - nearly in
No.25 - unloading underframe
BC - joint repairs
SWP - headboard
BC - joint repairs
No.25 - Body building
RER - sofa as installed
WR - boat afloat
WR - cox'n's platform
WR - finished deck
WR - Varnished deck
WR - ready for return
WR - stability test
WR - unveiling
WR - on the motorway
WR - having a trip out!
No.25 - in undercoat
No.25 - primer
No.25 - paint the gutter
No.25 - internal panels and floor
No.25 - roof above
SCL - in the air
SCL - Marske car down
SCL - lift controls
SCL - water tank end
SCL - upper end wheels
SCL - underframes waiting
SCL - water chute (crane)
SCL - loading in progress
SCL - PM wiring
SCL - new halfway
SCL - on test
SCL - cars passing
SCL - Cliff lift to beach and pier
SCL - latch locked
SCL - latch open
SCL - view down with pier
SCL - rebuilt Marske car at top
SCL - new Saltburn car at top
SCL - leaving Haltwhisle
SCL - arriving at Saltburn
SCL - repair 1
SCL - repair 2
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
440 visits
SCL - saltburn car in place
Saltburn car back in place, as the crane's lifting strops are removed.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.