BM CV - doors closed
BM CV - orginal chimney
BM CV - outside posed
BM CV - red shafts
BM CV - closeup
BM CV - loading
BM CV - leaving
BM CV - on bridge 1
BM CV - on bridge 2
NRM SP - front view
NRM SP - rear view
NRM SP - finished
NRM SP - loaded van
NRM SP - close up
NRM SP - underneath
NRM DS - Headstocks
NRM DS - Iroko for shildon
NRM DS - ACoulls from Shildon
NRM BoBo - buffer droop
NRM BoBo - A end split
NRM BoBo - B end split
NRM BoBo - traditional 3/4 view
NRM BoBo - glueing up
BM CV - flaps up rear
BM CV - by the door
BM CV - trough build
BM CV - hot chips
BM CV - gone green
BM CV - range goes here
BM CV - travis to fit
BM CV - lunch nearly done
BM CV - forewheel
BM CV - range insertion
BM CV - scuttle try
BM CV - scuttle repair
BM CV - both bunkers
BM CV - kitchen unit ready to return
BM CV - trying beads
BM CV - unit treatment
BM CV - flue seal top
BM CV 318- flue seal bottom
BM CV - ashpan
BM CV - wheels at last
BM CV - tasty chips
BM CV - first chips
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
289 visits
BM CV - flaps up from front
View from the front;
all hatches and doors open, flaps up.
Chalkboard menu, with pre-decimal prices.
A set of borrowed shafts (black painted metal) have been attached.
all hatches and doors open, flaps up.
Chalkboard menu, with pre-decimal prices.
A set of borrowed shafts (black painted metal) have been attached.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.