NER70 - sealer in place
NER70 - paintlayers
NER70 - conserved writing 1
NER70 - roof plank
NER70 - not a good plank
NER70 - roof boards done
NER70 - Dry fit of new side.
NER70 - replaced timber
NRM BoBo - buffer droop
NRM BoBo - A end split
NRM BoBo - B end split
NRM BoBo - traditional 3/4 view
NRM BoBo - glueing up
NRM BoBo - new headstocks
NRM BoBo - marking out
NRM BoBo - getting the point
NRM BoBo - know the drill
NRM BoBo - rivet count
NRM BoBo - Buffers
NRM BoBo - B End Back
NRM BoBo - A End Front
NRM BoBo - Old A-End
NRM BoBo - Old B-End
NRM BoBo - loaded up
NRM BoBo - Headstock on
NRM BoBo - letter detail
NRM BoBo - signwriting
NER70 - old floor
NER70 - last layer
NER70 - TiG - loco No.1
NER70 - Single Driver
NER70 - starting floor
NER70 - other side repairs
NER70 - floor 2
NER70 - floor 1
NER70 - roof stick joint
NER70 - at Chester Le Street
NER70 - writing 4
NER70 - writing 3
NER70 - writing 2
NER70 - brass ring
NER70 - old bolts 1
NER70 - oilcloth
NER70 - bung etc
NER70 - hole in the roof
NER70 - writing 1
NER70 - inside the roof
NER70 - delivery 4
NER70 - delivery 3
NER70 - delivery 1
NER70 - built 1870
1001 - hopper waggon
NER70 - delivery 2
NRM Bobo - NER BoBo No1
NRM Bobo - unpainted
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
526 visits
NER70 - sealing fabric
A small sample was removed for photograhic and identification purposes.
(taking suitable precautions, as the white substance is likely to be white lead putty)
Translate into English
(taking suitable precautions, as the white substance is likely to be white lead putty)
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.