BM BV - woodworm 2
BM BV - PGB new shaft
BM BV - underside planks
BM BV - missing shaft
BM BV - pony truck 1
BM BV - surfacer going on
BM BV - crack close 1
BM BV - stretchers replaced
BM BV - rub down
BM BV - exterior in undercoat 1
BM BV - exterior in undercoat 2
BM BV - gloss coat
BM BV - outside1
BM BV - finished1
BM BV - finished 2
BM BV - finished 3
BM BV - finished 4
BM BV - loading up
BM BV - loaded up
BM BV - on the way home
BM BV - floorboard sarnie
BM CV - chip arrival 2
BM CV - in store at Beamish
BM BV - woodworm 1
BM BV - extent 2
BM BV - extent 1
BM BV - no problems 4
BM BV - under planks 2
BM BV - no problems 3
BM BV - no problems 1
BM BV - no problems 2
BM BV - under planks 1
BM BV - interior before
BM BV - tailgate repairs 1
BM BV - tailgate before
BM BV - cill replaced
BM BV - hub cap name
BM BV - Bread Van arrive 2
BM BV - Bread Van arrive 1
BM BV - Bread Van in storage
NER70 - replaced timber
NER70 - Dry fit of new side.
NER70 - roof boards done
NER70 - not a good plank
NER70 - roof plank
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
350 visits
BM BV - repairs in progress 1
The areas of damage to the underframe have had replacement sections grafted in.
(Something possible with the strength of modern glues is to be able to retain a larger part of the original timber)
Translate into English
(Something possible with the strength of modern glues is to be able to retain a larger part of the original timber)
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.