MF - old deck
MF - frames under verge
MF - cockpit verge boards
MF - side deck verge boards
Formation screwing
MF - cabin side panels
MF - wheelhouse screens
MF - try side screen
MF - screens fitted
MF - old screens
MF - old screens joint
HHC - door
HHC - stairs
HHC - Hope Head Cottage
HHC - stairs detail
HHC - Hopehead before
NER70 - built 1870
NER70 - delivery 1
NER70 - delivery 3
NER70 - delivery 4
NER70 - inside the roof
NER70 - writing 1
NER70 - hole in the roof
MF - CF - Miller and RSG55022
MF - grab rails
MF - helm knitting
MF - here at last
MF - about to unload
MF - arrival 1
MF - pugwash
MF - gently up
DT - Dining 2
DT - Dining 1
DT - desk format
STR - Alston Finial 4
STR - turning 2
STR - turning1
CF - Conference Room view 1
CF - Conference Room view 2
CF - Conference Room view 3
CF - works and 6233
CF - garden 1
CF - garden 2
CF - exterior
CF - team at work
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
525 visits
MF - nail pulled
When the Miller was surveyed for the present owner, he was advised to pull a few nails and inspect them for corrosion.
This was the worst of the nails sampled, and it took quite an effort to extract it.
This was the worst of the nails sampled, and it took quite an effort to extract it.
aNNa schramm has particularly liked this photo
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.