Crushing plant
No exit
Carcasse d'automne*****************
Baths
Maison Coloniale inhabitée ORAN.
metal trash
Rhiwbach
So schön wie früher, so soll's wieder werden ? -…
le port de Camaret-sur-Mer
VERTUS
Winding remains
Loader
Décadence d'un escalier de plage
Escalier obsolète / Obsolete stair
Chaise en décadence / Abandoned beach chair
Magpie Mine
Fallen
Antenne obsolète de culte / Obsolete worship anten…
Treppenhaus-Blues
Deux bancs a l'abandon / Due panchine in disuso
Coca-Cola avec rouille / What about a tasty Coca-C…
not only the leaves fall in autumn...
Douceurs du soir sur la digue
Das Wrack >Uwe< - in der Elbe bei Falkenstein (Pi…
standing alone
Böckstein Österreich
Yet Another Sunken Boat
fallen and abandoned ripe prickly pears
Star Hotel
Einmal Volltanken dürfte nicht reichen ...
Perry Dale kiln
Urrós, Portugal HFF
Immobile
Rusticité en décadence (2)
Rusticité en décadence (1)
Old Road
Plantes contre maison abandonnée (2)
Plantes contre maison abandonnée (1)
Hält noch !
Wrecks - Infrared
Pocinho, Portugal
Drawing
Urrós, Portugal HFF
Middleton Mine
Location
Lat, Lng:
Lat, Lng:
You can copy the above to your favourite mapping app.
Address: unknown
Lat, Lng:
You can copy the above to your favourite mapping app.
Address: unknown
See also...
See more...Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
69 visits
Permanite asphalt
Originally, part of the larger Cawdor Quarry complex, Permanite Asphalt was incorporated in 1989 and manufactured various asphalt products, mainly flooring blocks used to waterproof floors, as well as roofing sheets. The process involved the mixing of aggregate, bitumen, sand and limestone. The plant took powdered limestone from several of the local quarries and mixed it with hot bitumen emulsion that was brought down from the refineries of Ellesmere port, this being a bi-product of the fuel oil-refining process. The mixed tar and limestone solution was poured into metal moulds on the floor of the big shed and allowed to solidify, then the back-breaking process of manually separating and stacking the cooled blocks could begin. The site was regulated by the local Derbyshire Dales District Council on the condition that the heating of tar or bitumen is regulated under section 6.3 of the Environmental Permitting Regulations.
In 2009, Permanite Asphalt relocated to Grangemill, becoming known as Ruberoid, which is part of the IKO Group. The company was dissolved in September 2016.
In 2018, developers Groveholt Ltd submitted plans for 586 houses in total for the ‘Matlock Spa’ development - with 468 of the homes to be built on the brownfield sites of Cawdor quarry and the former Permanite works. Currently these plans have yet to get off the ground, and the site remains derelict.
Thanks to Wally_urbex on 28DL for the information.
In 2009, Permanite Asphalt relocated to Grangemill, becoming known as Ruberoid, which is part of the IKO Group. The company was dissolved in September 2016.
In 2018, developers Groveholt Ltd submitted plans for 586 houses in total for the ‘Matlock Spa’ development - with 468 of the homes to be built on the brownfield sites of Cawdor quarry and the former Permanite works. Currently these plans have yet to get off the ground, and the site remains derelict.
Thanks to Wally_urbex on 28DL for the information.
Aus Blue, Steve Bucknell, Erhard Bernstein have particularly liked this photo
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.