Carbon black
Inorganic chemicals
Wallerscote hoppers
Point of Ayr gas terminal
Phosphate chemicals
CF Fertilisers
Soda Ash
Fushun industry
Saltend for chemicals
Chemical tanks
Lanxess Solutions UK Ltd
Alyn Works
unemployeed
Cellulose Factory M.
ex waterworld
Jumping from the pool edge prohibited
upstairs
after the rocket launch
Gärungschemie
Gärungschemie
downstairs - HFF!
Trafford Park chemicals
Welton C oil wells
Polythene plant
Air Products
Boilerhouse
Chemicals
Railway through the fence
Carbon Black
Oven top
Schwebebahn
Welcome to Alyn Works
Chemicals in Leek
Eastman Indorama
Carrington
Plastic bottles
Chemical factory
Coke car
Winnington at dusk
Synthite
Gate 1
Winnington kilns
Soda ash
Winnington at night
Wallerscote loader
IMG 5142-001-Battle of LongKesh
Cheshire chemicals
Lancashire Chemical Works
Boilers in retirement
PQ Corporation
Saltend Chemicals Park
EOS 6D Peter Harriman 14 43 12 4139. CogitansSimon…
Winnington Works
Boilerhouse
Oven top risers
Door opening
Bicarb wharf
ICI ruin
Safety on the battery
The Wallerscote telpher
Gainsborough for oil
Monckton gasholder
Location
See also...
See more...Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
214 visits
Point of Ayr gas terminal
This plant plant has a capacity to treat 8.5 million cubic metres (300 million cubic feet) per day at standard conditions of sour gas from offshore. The gas is brought ashore via a 51 centimetres (20 inches) diameter, 33 km long pipeline. The plant separates methanol (used for hydrate inhibition), water and condensate from the gas stream. The gas is sweetened with an amine solvent to remove sulphur compounds down to 3.3 ppm hydrogen sulphide and 35 ppm mercaptans. The hydrocarbon dew-point of the gas is reduced by mechanical refrigeration to a quality suitable for pipeline transportation. The treated gas is piped to Connah's Quay Power Station at 30 bar via a 27 km pipeline. Any gas surplus to the fuel requirements of the power station is further treated and delivered to the Burton Point terminal of the National Transmission System.
The site is owned by eni Liverpool Bay Operating Company Ltd, a subsidiary of eni UK Ltd. It is built near the site of a former colliery, which closed in August 1996. Approval for the site was given in February 1993, to be constructed by Hamilton Oil (of Denver, USA). BHP bought Hamilton Oil in 1991. The amount of gas to be brought onshore would be enough to provide electricity for half of Wales. Construction took place in 1994. eni bought BHP Billiton's interest in the Liverpool Bay Development in April 2014.
The site is owned by eni Liverpool Bay Operating Company Ltd, a subsidiary of eni UK Ltd. It is built near the site of a former colliery, which closed in August 1996. Approval for the site was given in February 1993, to be constructed by Hamilton Oil (of Denver, USA). BHP bought Hamilton Oil in 1991. The amount of gas to be brought onshore would be enough to provide electricity for half of Wales. Construction took place in 1994. eni bought BHP Billiton's interest in the Liverpool Bay Development in April 2014.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.