tarboat

tarboat club

Posted: 10 Aug 2020


Taken: 21 May 2016

2 favorites     0 comments    218 visits

Location

Lat, Lng:  
Lat, Lng:  
You can copy the above to your favourite mapping app.
Address:  unknown

 View on map

See also...

All in The North All in The North


Industrial shots Industrial shots


Lancashire Lancashire


Brick industry Brick industry


Old industry Old industry


See more...

Keywords

industry
lancashire
brick
quarry
aerial ropeway
claughton


Authorizations, license

Visible by: Everyone
All rights reserved

218 visits


Ready to go

Ready to go
Bucket 42 is on the rail and ready for launch at the top of the Claughton Brickworks aerial ropeway. The launcher is waiting for an empty bucket to reach a certain point on its way up before sending this full bucket of shale along the rail and onto the rope. This ensures that the load on the rope is kept evenly spaced and the speed correct as it operates entirely by gravity.

The bin is a bonus.

Nautilus, Gerrit Fischer have particularly liked this photo


Comments

Sign-in to write a comment.