Hollins Viyella
Hollins Viyella, Norton St Mills
The Iron Bull
Afternoon rush hour
Diamond Ropeworks engine detail
Diamond Ropeworks engine detail
The ice storm cometh
Springfield Tilery
Springfield Tilery
Climbing towards Qikeng Mine
Laid off
Beam engine action
Sijing cokeworks
Sijing cokeworks ovens
Schaumburg oven
Big train departing
Busy times on the Baotou slag tips
Vreoci washery
Flagging at the crossing
Victoria Mill, Congleton
Edward Mill, Hatter St, Congleton
Drill Hall tower
Glossop Co-op
The fulls in full cry
Boulton & Co Longport
R Tilsley
Broomhill firebrick
Bridgewater Collieries
Burn-axe firebrick
Bolton
On the crossing at Donghaikuang
Berry Hill Brick Works, Stoke On Trent
Berry Hill
Astley & Tyldesley Collieries
Armitage
Annesley
Accrington Nori B&T Co Ld
Accrington Nori B&T Co Ld reverse
Slurry digging
Steam in the dunes
NCB Hic-Bibi
Uphill in the semi-desert
Miner's train
Leaving Caiziba
Disused kiln - Acme Marls
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
177 visits
Coasting
First day on the lineside during the December 2008 trip and we decided to go to the Donghaikuang colliery system at Jixi as we had not been there before. There are not many trains to be seen on this line so we were lucky to get the loaded wagons being taken to the interchange during the afternoon. There was much debate as to whether the line was uphill away from the colliery at this point and we soon learned that it was downhill as the train coasted past with just steam showing from the brake pump exhaust.
The Donghaikuang mine can be seen in the background.
The Donghaikuang mine can be seen in the background.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.