New sinking
Stores
Senje Mine
24 Hour Security
Bukinje
Bringing home the empties
Inside the shed
Mine passenger service
Braysdown Colliery 18-4-60
Cefn Mawr Quarry
Murky weather
Danger Of Death
Tegg's Nose from the west
Sunset from Croker Hill
Cheshire Sunset
Ground frame
Shutlingsloe path
Jalainur pit
Wildboarclough from Shutlingsloe
South from Shutlingsloe
Dowlow Quarry
Castner Kellner afternoon
Mersey Sunset
Power station coal
Cheadle farewell
Washery sunrise
Opencast junction
Xiahua
Chlorine night
Meadowhall detail
Meadowhall
Peipiao
Keyboard entropy
Neepsend from Park Hill
Chickens
The burning tip
Sandaoling sunset
Pingzhuang
Running repairs
Back to base
Kostolac tower
Control Point
Topley Pike
Coke Oven
Park Hill
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
190 visits
Pingdingshan shift change
Early morning at Pingdingshan depot and several JS class locomotives are on shed for servicing and shift change. The steam parade is much diminished by the arrival of many new diesel locomotives but there is still plenty of atmosphere to be found here for the time being.
(deleted account) has particularly liked this photo
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.