Freighliner class 66 No.66520 on 4Z28 Fiddlers Fer…
92039 on 6S94 Dollands Moor to Irvine China Clay T…
Colas Rail 66850 at Greengate on 6J37 Carlisle Yar…
66848 at Colton Jnc on 6M86 Wolsingham to Ratcliff…
GBRf 66703 DONCASTER PSB 1981-2002 on 4N63 Eggboro…
DRS class 37 No.37425 with Directors Saloon Carol…
Network Rail class 31 No. 31233 pushing its train…
Memorial to the 12th Submarine Flotilla near Kyle…
Mackay Monument near Kylesku,Sutherland,Scotland 1…
617 Squadron Memorial at Woodhall Spa 11th October…
Canadian Lancaster landing at RAF Waddington 21st…
The BBMF Lancaster and the Canadian Lancaster tax…
Canadian Mynarski Memorial Lancaster (Vera) positi…
The Last Flying Vulcan XH558 at RAF Waddington,Lin…
Airbus A400M ZM403 at RAF Coningsby 11th October 2…
Battleship USS Missouri at Pearl Harbor,Hawaii tak…
Northern Lighhouse Board ship FINGAL at Oban taken…
CalMac Ferry M.V. ISLE OF MULL arriving at Oban
M.V. Albatros at Oban 22nd August 2013
CalMac Ferry IONA sails from Malaig for Armadale,S…
A long way from home,Falmouth Life Boat at Girvan…
P.S. MAID OF THE LOCH at Balloch Pier 29th August…
106 Squadron Memorial on Metheringham Airfield 11t…
Virgin Trains Voyger class 221 No. 221 105 at Beck…
66305+66424 at Beckfoot on 4S43 Daventry to Mossen…
60040 at Barnetby on 6M00 Humber to Kingsbury load…
66097 on 4R13 Cottam Power Station to Immingham em…
37218+37609 on a charter from Bristol TM to Carlis…
Eddrachillis Bay from Drumbeg 10th September 2015
Clashnessie Bay and Beach 10th September 2015
Cul Beag and Lochan an Ais from Knockan Crag 10th…
Beinn Mor Coigach 10th September 2015
Dundonnell River 10th September 2015
Idicator Board at Red point 9th September 2015
Ullapool 6th September 2015
Westland Sea King HAR3A 202 flight at RAF Waddingt…
Spanish Air Force Patrulla ASPA- Eurocopter EC 120…
The Reds at RAF Waddington 5th July 2014
Red Arrows,Hawker Hunter & 2 Knats at RAF Waddingt…
BBMF display at RAF Waddington 5th July 2014
BBMF Avro Lancaster B1 display at RAF Waddington…
Red Arrows BAe Hawk T.1 XX325 at RAF Waddington 5t…
SAAB Sk35C Draken landing at RAF Waddington 5th Ju…
SAAB AJS37 Viggen landing at RAF Waddington 5th Ju…
70013 leaves Scarborough on 1Z72 Sboro - Doncaster…
Location
Lat, Lng:
Lat, Lng:
You can copy the above to your favourite mapping app.
Address: unknown
Lat, Lng:
You can copy the above to your favourite mapping app.
Address: unknown
See also...
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
408 visits
Freightliner class 70 No.70005 on 6C16 Crewe to Carlisle Yard Departmental at Beckfoot 22nd May 2013
The Class 70 is a six axle Co-Co mainline freight GE PowerHaul locomotive series manufactured by General Electric in Erie, Pennsylvania. The orders in 2007 for 20 units, with an option for a further 10, for Freightliner for operations in the United Kingdom were the first orders for the PowerHaul type; General Electric's product code for the class of loco is PH37ACmi.
In November 2007, Freightliner UK announced Project Genesis (unrelated to GE's Genesis series built for Amtrak), a procurement plan for 30 freight locomotives from General Electric. The locomotives ordered were intended to match older types in terms of haulage capacity whilst at the same time being more fuel-efficient. The project was a collaborative effort between Freightliner and GE, with input from drivers on the cab design. The locomotives utilize a GE PowerHaul P616 diesel engine rated at 2,750 kW (3,690 hp). the locomotive meets EU Tier IIIa emission regulations. Freightliner expects that the locomotive's efficiency is 7% better than contemporary models, with a further 3% increase in efficiency whilst braking; regenerative braking is used to supply the energy to power auxiliary motors.
It was speculated that these locomotives would receive the TOPS classification Class 68, however the locomotives were given the Class 70 TOPS code, breaking the previous convention that class numbers in the 70s were used for DC electric locomotives.
The new locomotives are similar in appearance to a Class 58; a hood unit design with a narrow body typical of locomotive types in use in North America, the cabs are accessed from the rear via exterior walkways on the narrow part of the hood. The distinctive front end shape is due to crashworthiness features It is also fitted with air conditioning and acoustic insulation to improve the crew's environment, making it an improvement over the Class 66.
Construction of the first two locomotives at GE's Erie, Pennsylvania plant was completed in July 2009, with both locomotives being tested during the same month. The original plan was for two months of testing, with the locomotives then spending a further three weeks being modified where necessary and prepared for transport to the United Kingdom.
The first two locomotives (nos. 70001 and 70002) arrived in Britain on 8 November 2009 at Newport Docks. The delivery gave GE its first locomotives in service on the British rail network. The first locomotive was given the name 'PowerHaul' at Leeds on 24 November 2009.
Four more locomotives were delivered to the UK on 2 December 2009. On operation tests, 70001 hauled a 30-wagon train consisting of 60 iso containers during December 2009. 70002 also hauled a 19 hopper 1300 tonne coal train in the same month.
On 19 and 20 December 2010, five Class 70 locomotives were loaded onto Beluga Endurance at Erie, Pennsylvania; on 5 January 2011, the ship docked at Newport Docks. Locomotives 70008 to 70011 were unloaded without any problems; locomotive 70012 was being unloaded when part of the lifting gear failed, causing the locomotive to fall back into the hold of the ship and being severely damaged.
The BBC Colorado docked at Newport on 17 December 2011 and unloading of four more class 70s commenced in the late hours of the morning of 18 December 2011.
In November 2007, Freightliner UK announced Project Genesis (unrelated to GE's Genesis series built for Amtrak), a procurement plan for 30 freight locomotives from General Electric. The locomotives ordered were intended to match older types in terms of haulage capacity whilst at the same time being more fuel-efficient. The project was a collaborative effort between Freightliner and GE, with input from drivers on the cab design. The locomotives utilize a GE PowerHaul P616 diesel engine rated at 2,750 kW (3,690 hp). the locomotive meets EU Tier IIIa emission regulations. Freightliner expects that the locomotive's efficiency is 7% better than contemporary models, with a further 3% increase in efficiency whilst braking; regenerative braking is used to supply the energy to power auxiliary motors.
It was speculated that these locomotives would receive the TOPS classification Class 68, however the locomotives were given the Class 70 TOPS code, breaking the previous convention that class numbers in the 70s were used for DC electric locomotives.
The new locomotives are similar in appearance to a Class 58; a hood unit design with a narrow body typical of locomotive types in use in North America, the cabs are accessed from the rear via exterior walkways on the narrow part of the hood. The distinctive front end shape is due to crashworthiness features It is also fitted with air conditioning and acoustic insulation to improve the crew's environment, making it an improvement over the Class 66.
Construction of the first two locomotives at GE's Erie, Pennsylvania plant was completed in July 2009, with both locomotives being tested during the same month. The original plan was for two months of testing, with the locomotives then spending a further three weeks being modified where necessary and prepared for transport to the United Kingdom.
The first two locomotives (nos. 70001 and 70002) arrived in Britain on 8 November 2009 at Newport Docks. The delivery gave GE its first locomotives in service on the British rail network. The first locomotive was given the name 'PowerHaul' at Leeds on 24 November 2009.
Four more locomotives were delivered to the UK on 2 December 2009. On operation tests, 70001 hauled a 30-wagon train consisting of 60 iso containers during December 2009. 70002 also hauled a 19 hopper 1300 tonne coal train in the same month.
On 19 and 20 December 2010, five Class 70 locomotives were loaded onto Beluga Endurance at Erie, Pennsylvania; on 5 January 2011, the ship docked at Newport Docks. Locomotives 70008 to 70011 were unloaded without any problems; locomotive 70012 was being unloaded when part of the lifting gear failed, causing the locomotive to fall back into the hold of the ship and being severely damaged.
The BBC Colorado docked at Newport on 17 December 2011 and unloading of four more class 70s commenced in the late hours of the morning of 18 December 2011.
, Peter_Private_Box have particularly liked this photo
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Great picture of the class 70 here, especially the way you have chosen a location to get it banked over. I've seen a few about, but never to the point of getting a photo of one, so this gets a star from me!
Best Wishes
Peter
Alan Drury club has replied to Peter_Private_Box clubSign-in to write a comment.